Welcome to TMC Group





A global operator and a reliable partner for 28 years, trusted by leading companies

Pipeline Services
We offer EPC services, long-distance pipeline laying, pipeline repair, cold cutting, maintenance, nitrogen services, hydro testing, de-watering, pigging, air drying, leak detection, pipe freezing, bolting, and tank installation and fabrication.

Well Services
Our well services include coiled tubing, high-pressure pumping, stimulation, drilling, well construction, casing running, cementing, and drilling fluid services.

Civil Engineering and Construction
We provide civil engineering, electrical work, urban and rural works, public sanitation, major public works, irrigation, road and airport works, metal building production, air conditioning installation, and maintenance services.

Oil and Gas Drilling Chemical Supplies
We provide top-quality chemicals for oil and gas drilling, including drilling fluids, corrosion inhibitors, and demulsifiers. Our products boost efficiency, protect equipment, and come in flexible packaging. We offer reliable solutions for offshore exploration and refining.
Our Commitment to Quality, Health, Safety and the Environment

Our References
Project: Gas Pipeline Construction
Owner: SONEL GAZ
Main Contractor: COSIDER
Sub Contractor: TMC
Description: Supply of equipment, construction, and commissioning of gas pipelines in various locations.
Period: 2017-2018
Value: $50,000,000
Project: Water Pipeline Construction
Owner: Ministry of Irrigation
Main Contractor: TMC
Description: Water pipeline construction in Algeria, including long-distance pipeline laying and pump station installation.
Period: 2014-2016
Value: $75,000,000
Project: Steel Structure Fabrication
Owner: JK Cement
Main Contractor: RALCO
Sub Contractor: TMC
Description: Supply and erection of steel structures and cladding for cement plants.
Period: 2010
Value: $4,200,000
Project: Gas Supply Antenna
Owner: SONEL GAZ
Main Contractor: TMC
Description: Construction of gas supply antenna for electrical station in Skikda.
Period: 2016
Value: $11,500,000
Project: Rehabilitation of Gas Pipeline
Owner: SONEL GAZ
Main Contractor: TMC
Description: Rehabilitation of 16″ gas pipeline in Relizane, Algeria.
Period: 2016
Value: $22,300,000
Project: Bitumen Tank Construction
Owner: ETRHBHADDAD
Main Contractor: TMC
Description: Fabrication and erection of bitumen tanks with civil foundation.
Period: 2010
Value: $7,200,000
Project: Drinking Water Pipeline
Owner: Ministry of Irrigation
Main Contractor: TMC
Description: Construction of 88″ drinking water pipeline in Algeria.
Period: 2013
Value: $32,700,000
Project: Water Tank Construction
Owner: ETRHBHADDAD
Main Contractor: TMC
Description: Fabrication and erection of water tanks in Mostaganem City, Algeria.
Period: 2010
Value: $8,700,000
Project: Pipeline Construction
Owner: PTC & T
Main Contractor: TMC
Description: Construction and fabrication of 135KM, 24″ gas pipeline.
Period: 2009
Value: $19,100,000
Project: Gas Lift Extension
Owner: SONATRACH
Main Contractor: TMC
Description: Supply of material and conduct of extension works for gas lift and pressure maintaining networks.
Period: 2006-2008
Value: $13,600,000
Project: Valve Station
Owner: SONEL GAZ
Main Contractor: COSIDER
Sub Contractor: TMC
Description: Small valve station construction.
Period: 2005-2006
Value: $3,300,000
Project: Pipeline Tie – N
Owner: COSIDER
Main Contractor: TMC
Description: Complete erection of all pipeline tie – N 48″ gas line.
Period: 2008
Value: $4,600,000
Project: Looping Gem 48″Phase I
Owner: COSIDER
Main Contractor: TMC
Description: Realization of works of PR2, manufacture and assembly of elements of concentrated works.
Period: 2007-2009
Value: $15,200,000
Project: Looping Gem 48″Phase II
Owner: COSIDER
Main Contractor: TMC
Description: Civil and mechanical works for 48″ pipeline.
Period: 2007-2009
Value: $25,300,000
Project: PS Mounting
Owner: COSIDER
Main Contractor: TMC
Description: Completion of PS assembly work.
Period: 2007-2008
Value: $10,300,000
Project: Valve Station
Owner: COSIDER
Main Contractor: TMC
Description: Fabrication and erection of valve station.
Period: 2007-2008
Value: $9,100,000
Project: Pipeline Harbil Algeria – 8″
Owner: COSIDER
Main Contractor: TMC
Description: Civil and mechanical works for pipeline.
Period: 2007-2008
Value: $7,600,000
Project: Pipeline Tamez
Owner: COSIDER
Main Contractor: TMC
Description: Civil and mechanical works for pipeline.
Period: 2007-2008
Value: $11,200,000
Project: Gas Lift
Owner: SONATRACH
Main Contractor: TMC
Description: Supply of material and conduct of extension works for gas lift and pressure maintaining networks.
Period: 2006-2008
Value: $13,600,000
Project: Gas Lift
Owner: SONATRACH
Main Contractor: TMC
Description: Erection / fabrication for 2″ and 4″ pipeline.
Period: 2006-2008
Value: $10,200,000
Project: Project Valve Station
Owner: SONEL GAZ
Main Contractor: COSIDER
Sub Contractor: TMC
Description: Small valve station construction.
Period: 2005-2006
Value: $3,300,000
Project: Looping PC1 / PC3 Extension of the Enrico Mattei – O 48″ Gas Pipeline
Owner: SONATRACH
Main Contractor: COSIDER
Sub Contractor: TMC
Description: Prefabrication and assembly of elements of concentrated works.
Period: 2005-2006
Value: $11,500,000
Project: D.OG1-145 KM – 20”
Owner: BROWN & ROOT – CONDOR
Main Contractor: TMC
Description: Construction and erection.
Period: 2004
Value: $27,100,000
Project: Project Development – 405KM – 16″ Gas PP – TFT to Rhoud Nouss
Owner: SONATRACH
Main Contractor: TMC
Description: Construction and erection.
Period: 2002
Value: $35,100,000
Project: Transfer of EP System
Owner: SNC-LAVALIN INTERNATIONAL
Main Contractor: TMC
Description: Transferring of EP system.
Period: 2001
Value: $10,100,000
Project: Pipeline Construction of 10KM – 48”
Owner: Gulf Oasis Est.
Main Contractor: TMC
Description: Pipeline construction.
Period: 1998
Value: $21,500,000